Posts

Showing posts matching the search for mnre solar subsidy

Procedure to get subsidy on Solar PV Systems through NABARD in India

Image
Procedure to get subsidy on Solar PV Systems through NABARD in India  As on January 2016, Government has released a priority list for processing subsidy claims. Schools, public institutions, etc are higher up on the priority list and residential projects are lowest in priority list. And thus getting subsidy on residential projects is getting increasingly difficult. NABARD has stopped the subsidy scheme in March 2015:  https://www.nabard.org/uploads/Lighting%20circulat%2023%20March%202015.PDF Supply of electricity is quite unreliable in most parts of India. Due to increased scheduled and un-scheduled power cuts in most of the cities in India, interest in using electricity generated through alternate sources has also increased. However, high capital cost of setting up systems to tap energy through renewable sources is deterrent in taking up large-scale deployments of the same. To promote electricity generation using  solar  energy Government of India launched ...

E-Vidya Education Learning created more attractive

Image
Blended learning is a hot phrase Blended learning is a hot phrase in the present training world, which refers to a mixing of traditional face-to-face classroom facilitation with computer-based modules - usually self-paced online training. Quality online learning programs are high-input operations, requiring both time to develop and significant investments to run. Personalized learning is an educational approach that aims to customize learning for each student's strengths, needs, skills and interests. Our team can assist you with all of your e-learning course development projects from individual courses to a customized learning environment for any audience. Grow your specialist knowledge through practical, skills-based learning, or develop your leadership style through confidence-building event/ course/ training/ workshops. Our range of courses will give you the hands-on learning, industry connections and real-world perspective you’ll need to succeed. With more than 100 courses to...

About Solar Power

Image
Agency for Non-Conventional Energy and Rural Technology (Anert) has already introduced rooftop solar power plant programme.  Anert to provide solar energy to 25,000 more houses.  Cost of producing 1 KW of solar energy comes to around `2 lakh. Of this, `92,262 will be provided as subsidy from the Union and State governments. The solar energy policy will be extended to other industrial consumers in a phased manner. The policy is to mandate 100 litres solar water heater and 500 W solar photovoltaic systems for domestic building with floor area of between 2,000 sq ft to 3,000 sq ft. All buildings above 3,000 sq ft will have to install a 100-litre solar water heater and at least 1,000 W solar photovoltaic system. In case of residential flats and apartments, 5 per cent of the energy usage for common amenities should be from solar power How much land is required to setup a 1MW solar power generation Unit ? The land required for a 1 MW power plant setup is arou...

MNRE takes us by surprise 30% subsidy back in solar Power Plant

Image
There has been an unexpected shift in the thinking of the  MNRE  (Ministry of New and Renewable Energy) about subsidies. In the past few (recent) meetings, MNRE hosted for its channel partners it was apparent that the subsidy would be withdrawn completely for all customer segments in the Grid-connected Rooftop Solar segment. It was obvious by looking at their moves as well. Move 1: Subsidy for all: Commercial & Industrial, Residential, Institutional, Government and Social sector Quantum: 30% Move 2: Subsidy removed for Commercial & Industrial segment Move 3: Reduction of subsidy for the Residential segment, Institutional, Government and Social sector Quantum: 15% ( refer ) But then, no matter how much customers hoped for it, the following move was not foreseen. Surprising Move 4 (Nov 19 th , 2015): 30% subsidy for Residential, Institutional, Government and Social sector. A whopping 70% subsidy for the states: Sikkim, Uttarakhand, Himachal Pr...

MANPOWER REQUIREMENTS FOR SOLAR PV DEVELOPMENT

Image
Project planning Activities at the project planning phase comprise site selection, technical and financial feasibility studies, engineering design and project development. The first two activities involve measuring the solar resource potential and estimating the environmental and social impacts of developing a solar plant on an identified site. Engineering design involves identifying the technical aspects of the mechanical and electrical systems, the civil engineering work and infrastructure, the construction plan and the operations and maintenance (O&M) model. Project development consists of administrative tasks such as obtaining land rights, permits, licenses and approvals from different authorities; managing regulatory issues; negotiating and securing financing; negotiating and signing insurance contracts; contracting an engineering company; negotiating the rent or purchase of the land; and managing the procurement processes. EXAMPLE: Planning a 50 MW solar PV plant re...

net-metering in India

Image
Net Metering policy for roof top PVs in various states in India Solar powered systems can be divided as: Grid connected solar power system. Stand alone Offgrid system. When solar energy production is in excess as compared to the load requirement at that moment, the excess energy we can be either stored in the batteries or can be sold back to the utility grid. This difference of energy can be tracked using a meter connected to your solar pv system. usually following two types metering systems are involved: Gross metering Net Metering  Net metering is an agreement that allows the solar PV system owner to sell excess solar energy to the utility company or buy deficit energy from the utility company using a meter to track this energy exchange. Advantages of Net Metering: The most important advantages of net metering are: 1. Financial benefit for the system owner Since the system owner is charged for the net energy consumed from the utility grid, the ow...

Labels