MANPOWER REQUIREMENTS FOR SOLAR PV DEVELOPMENT
Project planning
Activities at the project planning phase comprise site selection, technical and financial feasibility studies, engineering design and project development. The first two activities involve measuring the solar resource potential and estimating the environmental and social impacts of developing a solar plant on an identified site. Engineering design involves identifying the technical aspects of the mechanical and electrical systems, the civil engineering work and infrastructure, the construction plan and the operations and maintenance (O&M) model. Project development consists of administrative tasks such as obtaining land rights, permits, licenses and approvals from different authorities; managing regulatory issues; negotiating and securing financing; negotiating and signing insurance contracts; contracting an engineering company; negotiating the rent or purchase of the land; and managing the procurement processes.
EXAMPLE: Planning a 50 MW solar PV plant requires an estimated 2,120 person-days of labour. Project development activity accounts for about 59 percent of this labour (1,250 person-days), followed by site selection (17%), engineering design (12%), and feasibility analyses (12%). Table 1 presents a breakdown of the total workforce needed in project planning by activity.
Almost 40 percent of the total person-days needed are for legal, energy regulation, real estate and taxation experts.
Source: http://www.solarquarter.com/index.php/analysis1/5574-requirements-for-solar-pv-development
THE TOP GOVERNMENT PROGRAMES IN THE SOLAR SECTOR
Only one answer: Institute of Solar Technology (http://istindia.org )
WHY?
See once Core Syllabus of Institute of Solar Technology
Site Assessments and Project Planing
- PV System Site Assessment
- Solar PV Site Assessment Procedure - Preliminary Solar Site Assessment, Site Access Notes
- Shading Analysis for Photovoltaic Systems - Objective and Subjective Shade, Static and Dynamic Shade, Whole and Partial Shade
- Shade and Power: The Multiplier Effect, Damage to Solar Panels
- Determine true south, Site Analysis, Sun paths, SUN PATHS DIAGRAM, Altitude and azimuth, Site Evaluation
Project Design and Documentation
- Basic principles of system design
- Steps to follow to design an efficient PV system
- Factors to be considered in Solar System Design
- System Design of Solar PV Systems - Load Analysis, Solar Array Design, Inverter Issues, Battery Sizing, Charge Controller
- Small Rooftop Solar Power Plant Calculation - Load Calculate, Inverter Selection, Battery Bank Calculation, PV Array Design, PV Array Design Error Checking
- Street Light, Water Pump Design & Calculation
- Solar PV Power Plant Design & Calculation: 5 KWp, 10KWp, 15KWp and so on, CALCULATE MAXIMUM STRING SIZE, CALCULATE MINUMUM STRING SIZE, CALCULATE NUMBER OF STRINGS IN PARALLEL, QUICK CROSS CHECK OF STRING SIZING
- PLANT BoS equipment sizing - Minimum Voltage Rating, Minimum Current Rating, Cable Selection and Sizing, Fault Current Protection, String Fuses, Module cables, cable voltage rating, current carrying capacity of the cable, Protection against overcurrent and overvoltage, AC Cables, Cable losses, Cable Tags, Junction Boxes, DC Switches/Disconnects, Circuit Breaker, Data Monitoring, Design Documentation, Drawing Sheet, Energy Yield Prediction, SPECIFIC ENERGY YIELD, CUF, PERFORMANCE RATIO, Ideal Energy, Bill of materials, Quotation, PO, Cost price of solar PV power system, Payback Period
- Solar PV Software Training - Design Aspects, Site Analisise using solar software, Calculation shadow effects, PV Array Design, Tracking System, I-V characteristics, Electrical Assembly, power generation calculation, Economic efficiency simulation, Economic Efficiency Report etc
- Project Feasibility study of Techno-commercial Reporting, DPR & PPA making for PV Power Project
PV Project Management
- What is Project ?
- Project Management, Project Management Processes
- Project Management Knowledge Areas - Develop Project Charter, Develop Project Management Plan, Manage Project Work, Monitor and Control Project Work, Perform Integrated Change Control, Close Project or Phase
- Project Scope Management
- Project Time Management, Bar charts
- AOA, CPM, PERT
- Project Cost Management, PV, EV, BCWS, AC, EAC, CPI, ETC, CV, SPI, VAC
- Project Quality Management
- Project Human Resource Management
- Project Communications Management
- Project Risk Management
- Project Procurement Management
- Project Stakeholder Management
- Project vs Operational Work
- Project Stakeholders
- Detailed Site Analysis, Basic Engineering
- Technology Selection
- Due Diligence Services in PV Projects
- Yield Projection, PV Performance Projection
- Implementing MW Solar Power Plants - Action Framework
- Getting a PPA for a MW Solar Power Plant
- EPC Selection for a MW Solar Plant