PV POWER PROJECT TRAINING - April 2014
April, 2014 Training session will be start from 15th April.
Course Content:
Theory Class
|
Practical Class
|
Principle of operation of
Solar Energy – Solar Photovoltaic Technology, Photovoltaic Effect, Solar Cell, Types of Solar Cell, Technical Specification of Solar PV module,
Power (Pm),
Open circuit voltage,
Short Circuit Current,
Voltage at Maximum Power,
Current at Maximum Power,
STC,
Temp. Coefficients,
IV curve,
Application of Solar Energy
Audio-Video Class
|
1. Identify Solar PV cell/module
2. Measuring – short circuit current, open circuit voltage of one cell Measuring – short circuit current, open circuit voltage of Two cell connected in Parallel
4. Measuring – short circuit current, open circuit voltage of Two cell connected in Series
|
Solar Insolation – Definition,
Factor to be considered in Solar system Design, Solar Intensity,
Solar Spectrum,
Solar Window,
Peak Sun Hours,
Solar Declination,
Insolation and Latitude,
Audio-Video Class
|
5. Effect of shading on short circuit current for solar cell in Parallel.
6. Effect of shading on short circuit current for solar cell in Series.
|
Solar Photovoltaic Module Tilt Angle Scale – Tilt angle,
Significance of the tilt angle scale,
Best angle for solar panels.
Fixed Tilt, Adjusting Tilt
Audio-Video Class
|
1. Measuring voltage, current and power under load for one cell
2. Measuring voltage, current and power under load for two cell in Parallel
3. Measuring voltage, current and power under load for two cell in Series
4. Measuring voltage, current and power under load for two cell in Parallel using resistors
5. Short circuit current and light source distance
6. Measuring the effect on Sun angle on current output and Voltage output
|
PART – I – Step-by-Step Design of rooftop PV system
| |
General issues of system Designers – Identify potential applications, Gather load information, climate information, Site survey, System Components
Rooftop PV System Calculation – Load Estimates, Solar Array Design, Battery Calculation, Mounting Structure, Controller and PCU calculation.
|
Battery Information –
1 string of 6 volt batteries wired in Series, Parallel, series & parallel
Series and Parallel wiring of PV modules.
Computer Lab:
Calculation of various Rooftop PV system
|
Case Study – Designing Solar Home Lighting Systems, Designing Stand Alone Solar PV Power Plant
|
Solar PV Electrical Single line Schematic – Plan,
Rooftop Layout Plan,
Single line Diagram,
Foundation for ground mounted array, Mounting structure Design
|
PART – II – Rooftop PV System Installation
| |
Preparing Project File
Submit Computer Lab Sheet
Submit Drawing/Plan Sheet
Submit Test Result Sheet
|
Practical practice using lab PV array and PCU.
Setup Mounting Structure,
Array assembly, wiring & Testing,
Battery Installation
Earthing
PCU Installation
|
Award of Certificate
On successful completion of the course, participants will be awarded Certification in Rooftop PV System Installer. Successful completion will be measured based on the following
A minimum of 75% credit is required to award certificate.
The course would benefit anybody who wants to work with solar PV system, who is working on solar PV system for design, installation and maintenance of solar PV systems of all types. The training programme would also be an excellent opportunity to learn several aspects of Solar PV technology with hands on experience in designing and assembling solar PV systems.
- Class Participation/Attendance (20%)
- Assignments (40%)
- Group Work (20%)
- Final Examination (20%)
A minimum of 75% credit is required to award certificate.
Through the above courses IST teaches:
Applications
Application is the need of the customer.
Configuration
Configuration is based on the need designing a rooftop PV system/configuring a rooftop PV system.
Installation
Installation is bring a rooftop PV system into working condition.
Testing
Once the rooftop PV system is installed, test the system whether it is meeting all its parameters for which the system was designed.
Training Duration: 20 days
Eligibility: Minimum 10+2 Pass
Medium of Instruction is English & Bengali. Study material is in English.
Course certification is awarded upon successful completion of both the written and practical assessments; this certificate can then be used as evidence of your training and ability to install and commission Rooftop PV systems.
Eligibility: Minimum 10+2 Pass
Medium of Instruction is English & Bengali. Study material is in English.
Course certification is awarded upon successful completion of both the written and practical assessments; this certificate can then be used as evidence of your training and ability to install and commission Rooftop PV systems.