Course Overview

The course majorly focuses on hands-on training for component installation, commissioning of 1 kWp Solar PV Power Plant. It will also focus on Operations and Maintenance practices pertaining to solar PV systems. The participants will also be given training on marketing & entrepreneurship skill so that they will become the campaigners of solar energy.  Training curriculum as per NOS, Govt. of India and training provided by Govt. certified trainer. 


Study of solar photovoltaic cell & solar photovoltaic module, type and size of PV cell and 
PV module, Fundamental types of modules and its applications, PV components 
 1. Solar Photovoltaic system
 2. Types of solar photovoltaic system
 3. Grid connected solar PV system
c. Off Grid connected solar PV system/Standalone Solar PV
d. Series and Parallel connections of battery and Modules 


Practical Competencies
Fundamental
a. Series and Parallel connections of battery and Modules
b. Reading and observations of PV power
c. Module datasheet reading
d. Inverter datasheet reading


site survey
b. Site survey form filling
c. Analyzing the shading objects
d. Land analysis


Installation
Observing Installation of Inverter, LT panel, PV module Series & parallel connection & testing
c. Earthing pit design
d. Earthing pit location/sizing
e. Layout observation


Part 1
a. Civil Foundations
b. Module mounting structure and fixing of the same.
c. Proper alignment and tightening.
d. Fixing of structure and its connection.


Part 2
a. Module mounting 
b. Inverter Installation and Connection
c. Installation of balance equipment and End termination Power cable.
d. Installation of Junction
e. String testing DC Side box
f. Pole Erection, Types of pole
g. Cable tray , types of cable tray & cable Tray
h. Erection Battery , types of battery , Installation of Battery


Part 3
a. Inspection, Testing & commissioning of PV plant
b. Purpose for Inspection & testing
c. Tools/Instrumentation required
d. Procedure and Work Method Study of work method & document for the followings
e. String Testing –Pre-checks
f. Short Circuit Test-Work Method
g. Inverter Testing-Work Method
h. Dismantle of Module mounting structure
i. Termination Power cable.


Part 4
a. Module mounting 
b. Inverter Installation and Connection
c. Installation of balance equipment and End termination Power cable.
d. Installation of Junction
e. String testing DC Side box
f. Cable tray , types of cable tray & cable Tray
g. Inspection, Testing & commissioning of PV plant
h. Power evacuation
i. Grid Synchronization


Operation & Maintenance
a. Solar PV module cleaning & testing
b. Inverter testing,
c. Battery testing,
d. Cell voltage testing
e. Earthing testing,
f. Cable testing.

Popular posts from this blog

Solar energy consulting & management services, detailed project report, energy management consultants, 1 Kw Rooftop Solar System should be for every house

1kw solar power plant specification

MANPOWER REQUIREMENTS FOR SOLAR PV DEVELOPMENT

Industrial Vocational Training for Engineering Students

বিপর্যয় এড়াতে ভূগর্ভের জলস্তর রক্ষা করার ডাক

Solar Energy Industry in India & Its Future Prospects

NIESBUD Entrepreneurship Development Program on Solar Energy

Sustainable Community Development

IST-Magazine India Sets Year-on-Year Targets to Reach Ambitious 2022 Solar Goal

IST-Magazine Solar Energy Applications for Agriculture in India

Labels

Show more